LKB Engineering was retained to perform civil and structural engineering of a new building on the Jamaica School Campus. The site work included a new water quality capture volume pond, new dedicated fire access, and hydrant, updated utilities, and coordination with the existing surrounding site conditions. LKB Engineering also coordinated the MS4 permitting requirements between the City of Aurora and Aurora Public Schools.
Through a series of coordination meetings with the City of Aurora, LKB Engineering was able to have the 100-year detention requirement waived thus reducing the detention pond size allowing the pond to fit in the front of the building rather than on the backside. This design change saved the client over $200,000 in site work and pond construction.
To learn more about LKB Engineering’s Engineering Design services or to speak with an Engineering Expert, call 888.298.5162 or submit an inquiry.
This project was originally awarded to The Vertex Companies, LLC, transferred to LKB Engineering, PLLC in December 2024.