Miami International Airport header

The Miami International Airport Central Base Apron and Utilities Modification and Expansion project includes restoration of the North Terminal Development (NTD) Gate Area, reconstruction and expansion of the north apron over the existing drainage canal, reconfiguration of the area south of the NTD for additional aircraft parking, realignment of the vehicle service road and reconstruction of the existing central base apron pavement, drainage, and lighting. More specifically, LKB Engineering provided the temporary drainage plans and report for the multi-phased project to ensure compliance during the removal of the existing storm and the installation of the new storm sewer utilities. A phased construction approach in addition to a multitude of other existing onsite utilities required a well-coordinated effort between the airport, the contractor and the engineer to allow for timely and proper installation of the utilities for the Project.

This project was originally awarded to The Vertex Companies, LLC, transferred to LKB Engineering, PLLC in December 2024.

Ready to Get Started?

Speak with an Expert

Contact Us